---
agentTools:
  siteIndex: https://docs.gusto.com/llms.txt
  projectIndex: https://docs.gusto.com/embedded-payroll/llms.txt
---

# Added contractor lifecycle webhooks for future-dated transitions

We've added four contractor webhook events`contractor.deactivation_effective`, `contractor.deactivation_cancelled`, `contractor.reactivation_effective`, and `contractor.reactivation_cancelled`. Read more in our [Contractor Events](https://docs.gusto.com/embedded-payroll/docs/contractor-events) guide.

| Webhook event                       | When it fires                                                                                                                                                                                                                           |
| ----------------------------------- | --------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- |
| `contractor.deactivation_effective` | When the dismissal takes effect (the day after `end_date`). Sent immediately if the dismissal's `end_date` is in the past. If the dismissal's `end_date` is today or in the future, this event is sent on the day after the `end_date`. |
| `contractor.deactivation_cancelled` | When a pending dismissal is cancelled via [DELETE /v1/contractors/\{contractor\_uuid}/termination](https://docs.gusto.com/embedded-payroll/reference/delete-v1-contractors-contractor_uuid-termination).                                                                              |
| `contractor.reactivation_effective` | When a rehire takes effect (on `start_date`). Sent immediately for current- and past-dated rehires. Sent on the effective date for future-dated ones.                                                                                   |
| `contractor.reactivation_cancelled` | When a pending rehire is cancelled via [DELETE /v1/contractors/\{contractor\_uuid}/rehire](https://docs.gusto.com/embedded-payroll/reference/delete-v1-contractors-contractor_uuid-rehire).                                                                                           |

<Callout icon="ℹ️" theme="info">
  ### **Clarification for existing events**

  `contractor.deactivated` and `contractor.reactivated` fire at **record time**—the moment the dismissal or rehire is recorded, regardless of when the change actually takes effect. If you rely on these events to signal that the status transition has already taken effect, subscribe to the corresponding `_effective` event instead.<br /><br />When a scheduled dismissal is cancelled, `contractor.deactivation_cancelled` is now emitted instead of `contractor.reactivated`.
</Callout>

## Why this matters

If your integration keys off the exact point a contractor becomes active or inactive—such as for time tracking, benefits, access provisioning, or reporting—you need a signal at the effective date, not at record time. The new `_effective` events fire on the effective date, closing the gap for future-dated transitions. The new `_cancelled` events give you a clean signal for when a pending dismissal or rehire is called off.

Read more in our [Contractor Events](https://docs.gusto.com/embedded-payroll/docs/contractor-events) and [Deactivate a contractor](https://docs.gusto.com/embedded-payroll/docs/terminate-a-contractor) guides.